Milling and paving work in the Village of Airmont will begin on or about Monday, November 14, 2022. The following roadways will be affected weather permitting:
- Christmas Hill Road
- Victoria Drive
- Lamplight Lane
- Kristofferson Court
- Eros Drive
Portions of the streets will be closed during these construction periods, however, limited access will be provided to residents.
PLEASE BE ADVISED ON STREETS WHERE PAVING IS SCHEDULED TO TAKE PLACE ALL LEAF BAGS MUST BE OFF THE PAVEMENT AND PLACED ON LAWNS
Once milling has been completed, please use caution while driving or walking in these areas during construction, as the manholes will be raised and pavement will be uneven. Motorists should slow down and use caution while traveling these roads to avoid potential damage to vehicles. Every effort will be made to minimize inconvenience, however this project will cause a disruption of normal routines and schedules. Thank you for your patience and cooperation as we work to make these improvements to our Village.